30 Minute Fire Light - NL604D

 

 

 

 

 

 

 


30 Minutes Intergrity

Test Standard:
BS 476: Part 20: 1987

General description of the assembly

Size Range:

Ventialtion:

Glazing Specification:


Insulation:
Foam or Cork insulation can be fitted externally to suit your requirements.

Installation:
Supply on supply and fit is available

Cleaning / Maintenance:
Cleaning - Thermoformed roof lights should be washed down with a mild detergent and warm water. Do not use abrasives.

Maintenance - Annually check mechanical components, and lubricate where necessary, acutate components

Main Frame Work:
Manufactured with 14 Gauge galvanised steel, powder coated to suit your requirements. (maximm size unit, clear light size 1700mm x 1700mm)

Test References: 62325 click here for report

Test Standards: B.S. 476 : Part 20 : 1987

Delivery period:
From reciept of all information (4 - 6 weeks)

 

Back to Fire Sky Lights